Barnsley town centre, The Glass Works and Market Hill
Barnsley has rebuilt its markets as The Glass Works and has seven masterplan frameworks for new homes. We write fire strategies for shopping and leisure buildings, new neighbourhoods and the listed town centre.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Barnsley buildings
The Glass Works is a two phase redevelopment of Barnsley Markets that the council puts at more than £190m. Its square opened on 9th September 2021 and the council plan for 2024 to 2027 says nearly 90 percent of its units are let.
The Local Plan was adopted on 3rd January 2019. Seven sites have masterplan frameworks, including Barnsley West, Carlton and three sites at Hoyland.
The borough has 18 conservation areas, three of them in the town around Regent Street, Victoria Road and Huddersfield Road. Locke Park Tower and the Church of St Mary are listed Grade II*.
Who decides
Who approves a fire strategy in Barnsley
- Planning
- Barnsley Metropolitan Borough Council (official source, opens in a new tab)
- The planning authority for the town and the borough.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- The council's team also issues sports ground safety certificates.
- Fire and rescue
- South Yorkshire Fire and Rescue (official source, opens in a new tab)
- Barnsley Fire Station is on Broadway.
- Masterplans
- Barnsley masterplan frameworks (official source, opens in a new tab)
- The council's frameworks for the seven large housing sites.
Local issues
What a Barnsley fire strategy has to deal with.
Markets and leisure under one roof
The Glass Works combines a market, shops and leisure. Mixed assembly and retail need smoke control and exit capacity designed as one.
Sports grounds
The council issues sports ground safety certificates through building control. Stands and stadium buildings need fire strategies that match the certificate's requirements.
Masterplan sites
Seven masterplan frameworks guide large housing sites. Phased estates need fire service access agreed from the first phase.
A listed town centre
The war memorial, unveiled on 11th October 1925, St Mary's Church and Locke Park Tower are listed Grade II*. Barnsley Town Hall is Grade II.
Building types
The building types we see in Barnsley
- Fire Strategy for Retail and Leisure Buildings
The Glass Works
- Fire Strategy for Blocks of Flats and Apartments
Homes on the masterplan sites
- Fire Strategy for Heritage Buildings and Conversions
The town hall and listed churches
- Fire Strategy for Hospitals and Healthcare Buildings
Barnsley Hospital on Gawber Road
What we deliver
Fire strategy services in Barnsley.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Barnsley, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsBarnsley Metropolitan Borough Council is the planning authority. Its Local Plan was adopted on 3rd January 2019.
Guides
Guides worth reading first.
More in Yorkshire and the Humber
All locationsFire strategy in Barnsley
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply