Aberystwyth town centre, the Promenade and Trefechan
Aberystwyth has a Grade I Old College whose history begins with a John Nash house, the Grade II* National Library of Wales and an 1865 pier by Eugenius Birch. We write fire strategies for university, heritage and hospital buildings in the town.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Aberystwyth buildings
The history of Aberystwyth University's Old College begins with Castle House, built by John Nash in 1794. Ceredigion's £10.8 million Levelling Up Fund award, now called Local Regeneration Funding, bought the former Y Cambria office block for the Old College project and went toward 39 bedrooms in the main building. A 2026 council release says the money has also paid for improvements to public spaces along the Promenade.
The National Library of Wales is listed Grade II*, as are the former Assembly Rooms, which opened in July 1820. The pier, 800 feet long, was built by Eugenius Birch in 1865 and is listed Grade II with its pavilion.
Hywel Dda University Health Board says Bronglais General Hospital will continue to provide hospital services for mid Wales. A Green Futures Innovation Park proposed at the university's Gogerddan campus is a candidate for the Mid Wales Growth Deal, which Ceredigion and Powys County Councils lead.
Who decides
Who approves a fire strategy in Aberystwyth
- Planning
- Ceredigion County Council (official source, opens in a new tab)
- Decides applications in Aberystwyth and across Ceredigion.
- Building control
- Ceredigion County Council Building Control (official source, opens in a new tab)
- Registered Building Inspectors who work closely with the fire service. Work on higher-risk buildings in Wales is approved by the council, not by a national regulator.
- Fire station
- Aberystwyth Fire Station (official source, opens in a new tab)
- At Trefechan, where the service bases command and administrative teams as well as crews.
- Townscape
- Pride in Place Impact Fund (official source, opens in a new tab)
- The grant scheme for commercial frontages in the Aberystwyth Conservation Area.
Local issues
What an Aberystwyth fire strategy has to deal with.
Bedrooms in a Grade I college
The council's 2024 update described 39 bedrooms being built in the main Old College building, with a target of December 2025. Sleeping accommodation inside Grade I fabric needs detection, compartmentation and escape that the listed structure can accept.
Shopfronts in the conservation area
The Aberystwyth Townscape Enhancement Scheme gives a 70 percent grant toward the frontages of commercial properties, with works to finish by 31st January 2027. Where a shop has rooms above, a new frontage must not weaken the protected way out from the upper floors.
A pier and pavilion
The pier runs 800 feet and is listed Grade II with its pavilion. On a pier, escape and fire service access both depend on the length of the deck and the route back to land.
A national collection
The National Library of Wales is listed Grade II*. A library of that kind raises the question of how fire is detected and contained early, before water or smoke damage reaches what the building holds.
Building types
The building types we see in Aberystwyth
- Fire Strategy for Heritage Buildings and Conversions
The Old College, the former Assembly Rooms and the pier
- Fire Strategy for Schools and Education Buildings
Aberystwyth University, AberInnovation and IBERS
- Fire Strategy for Hospitals and Healthcare Buildings
Bronglais General Hospital
- Fire Strategy for Transport and Infrastructure
The Grade II railway station, rebuilt in 1924 and terminus of the Vale of Rheidol line
What we deliver
Fire strategy services in Aberystwyth.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreCommon questions
Fire strategy questions in Aberystwyth, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsCeredigion's plan page says LDP1, adopted in 2013, continues as the development plan until a replacement is adopted. Full Council paused work on LDP2 on 21st October 2021 over phosphates in the River Teifi Special Area of Conservation.
Guides
Guides worth reading first.
More in Wales
All locationsFire strategy in Aberystwyth
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply