Skip to content

Hull city centre, the Old Town and East Bank

More than 90 percent of Hull lies in Flood Zone 3a and the city has 27 conservation areas and around 473 listed buildings. We write fire strategies that work with its flood design, its heritage and its new neighbourhoods.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Hull buildings

Hull's Local Plan, adopted in November 2017, plans for at least 9,920 net new homes to 2032. It records that over 90 percent of the city is in Flood Zone 3a and relies on flood defences.

In the city centre, Capital&Centric became preferred partner for Albion Square on 19th May 2026 and demolition of the former BHS building is expected to start in early 2027. East Bank Urban Village plans about 850 homes, with a first phase of 115 affordable homes submitted on 15th April 2026.

Who decides

Who approves a fire strategy in Hull

Planning
Hull City Council (official source, opens in a new tab)
The planning authority for the city.
Building control
The council or a registered building control approver (official source, opens in a new tab)
Higher-risk buildings are approved by the Building Safety Regulator.
Fire station
Hull Central Fire Station (official source, opens in a new tab)
Humberside Fire and Rescue Service's station on Pearson Street, opened in May 2017.
Combined authority
Hull and East Yorkshire Combined Authority (official source, opens in a new tab)
Established by an order made on 4th February 2025.

Local issues

What a Hull fire strategy has to deal with.

01

Building in a flood zone

Flood resilient design can raise ground floors or move plant upstairs. The fire strategy has to work with those choices, from escape routes to where fire service access and equipment go.

02

The Old Town

Holy Trinity, now Hull Minster, is listed Grade I and the Guildhall Grade II*. Wincolmlee became the city's newest conservation area on 26th February 2026.

03

Docks and waste sites

Humberside Fire and Rescue Service fought a scrap metal cargo fire at Albert Dock on 27th June 2025 and a waste fire on Reservoir Road on 11th August 2026. Port and waste sites need planning for large outdoor fuel loads.

04

Phased neighbourhoods

East Bank Urban Village will grow in phases toward about 850 homes. Each phase needs fire service access and water supplies that work before the next is built.

Building types

The building types we see in Hull

Common questions

Fire strategy questions in Hull, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

It can. Where floors are raised or plant moves upstairs to manage flood risk, escape routes, fire service access and the position of fire safety equipment have to follow. The two designs should be settled together.

Guides

Guides worth reading first.

More in Yorkshire and the Humber

All locations

Fire strategy in Hull

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.